Newsletter 12 – SafeStand® 1200

+44 (0)208 795 3579

Newsletter 12 – SafeStand® 1200

In keeping with our ongoing remit of continual research and development of all Safestand® products; we have now designed and are producing an all new and improved SafeStand® 1200 System. This new version of our main product the SafeStand® 1200 includes substantial weight savings to the end user in the region of 30%. Despite the reduced weight of the system we have maintained the incredible Safe Working Load capacity of 1000kg per stand.

SafeStand® 1200 Access System

Typically, each 13’ (4m) run would include:
4 x SafeStands®
4 x Front Posts®
16 x Horizontal Guardrail
2 x Anti-Flip Brackets
2 x Toeboard Brackets
1 x Ladder Support Bracket
4 x Diagonal Braces (Platform Heights Above 1.8m)

And will also require:
6 x 13’ Scaffold Boards
1 x Safestand® Staircase or Steel Pole Ladder
1 x Ladder Lashing
4 x Brickguards

Erected Platform Heights = 1320mm, 1360mm, 1530mm, 1700mm, 1870mm, 2040mm & 2210mm

System Width = 5 x Scaffold Boards = 1275mm o/a

New & Improved SafeStand® 1200 Access System

Typically, each 13’ (4m) run would include:
4 x SafeStand®
4 x Front Posts®
16 x Horizontal Guardrail
2 x Anti-Flip Brackets
2 x Toeboard Brackets
1 x Ladder Support Bracket
4 x Diagonal HB Braces (Platform Heights Above 1.8m)

And will also require:
6 x 13’ Scaffold Boards
1 x Safestand® Staircase or Steel Pole Ladder
1 x Ladder Lashing
4 x Brickguards

Erected Platform Heights = 1320mm, 1360mm,1530mm, 1700mm, 1870mm, 2040mm & 2210mm

 System Width = 5 x Scaffold Boards = 1275mm o/a

 

  SafeStand® Component Weights
  SafeStand® 1200 New & Improved SafeStand® 1200
SafeStand® Upper 13.0kg 9.0kg
SafeStand® Lower 21.0kg 15.0kg
SafeStand® Removable Front Post 3.1kg 1.6kg
SafeStand® 5 Board Anti-Flip Bracket 4.9kg 4.9kg
SafeStand® Guardrail 2.1kg 2.1kg
SafeStand® Shortguardrail 1.0kg 1.0kg
SafeStand® Return Toeboard Bracket 1.2kg 1.2kg
SafeStand® Braces 3.0kg (Std) 3.0kg  (HB)
Safe Working Load Per Stand 1000kg 1000kg

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

FORS Silver & Bronze Accreditation

+44 (0)208 795 3579

FORS Silver & Bronze Accreditation

21st January 2021

SafeStand® Ltd have been a member of the Fleet Operators Recognition Scheme (FORS) since 2013. By joining the FORS scheme it has helped us make the roads safer, cleaner and less congested. For vehicle operators, it offers peace of mind that they are meeting their legislative requirements, as well as helping to increase efficiency, reduce costs, pollution and noise while striving to minimise road risk and environmental impacts.

Towards the end of 2020 we had both our FORS Silver and Bronze accreditations up for renewal. This process requires all our vehicles, fleet company policies and procedures to be audited to the new version 5.1 FORS Standard. We can proudly say that we have achieved reapproval for both the FORS Sliver and Bronze accreditations. We will continue to raise our levels in fleet operations as we strive to meet best practice in safety, efficiency and environmental protection while transporting our goods across the UK.

St Peters Church

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

Specialist Hospital, Birmingham

+44 (0)208 795 3579

Specialist Hospital, Birmingham

18th December 2020

Vinci Construction are working on £100m specialist hospital facility in Birmingham. The facility will provide care to private patients in the area and extra capacity for NHS patients. It is being built on the Queen Elizabeth Hospital Birmingham campus for a partnership with HCA UK & UHB.

The 138-bed hospital will include a radiotherapy unit, operating theatres and will provide complex procedures and treatments across cancer, neurology, orthopaedics and more.

AKS Building Ltd have hired our SureStand 500 system to complete a portion of the works on site.

The project is due to be completed in 2022.

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

Cherry Park

+44 (0)208 795 3579

Cherry Park

11th December 2020

Cherry Park is an exciting new mix use development situated partly in Westfield Stratford, one of Europe’s largest shopping centres. The development consists of high quality residential, commercial and retail units with ample green spaces.

George and his team from Swift Brickwork Contractors are pushing ahead with the blockwork package, utilising the simplicity and speed of assembly of the 1200 system to provide a safe and stable working platform.

Swift are a valued customer of SafeStand and as demonstrated in the attached pictures produce a very professional finish, well done to all involved.

St Peters Church

St Peters Church

St Peters Church We are looking forward to seeing the finished results.

St Peters Church For further information on the above project please visit please visit https://www.gillespies.co.uk/projects/cherry-park.

For further information on the mentioned SafeStand system please visit https://hs.dm-me-staging.co.uk/features/.

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

SafeStand back with the boots on the ground in The City!

+44 (0)208 795 3579

SafeStand back with the boots on the ground in The City!

3rd December 2020

St Peters Church

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk