The Dorchester Hotel

+44 (0)208 795 3579

The Dorchester Hotel

06th July 2022

The luxurious Dorchester Hotel in Mayfair, which has been running since 1931, is currently undergoing its biggest renovation since 1989. Prior to the Hotel opening the building was previously known as Dorchester House and has been the American Embassy & was utilised as a hospital during World War I, before being demolished in 1929.

The current areas undergoing refurbishment are the Main Entrance, two of the guest floors and The Bar at The Dorchester. These renovations are planned to take place from February 2022 until September 2022.

Winchmore Brickwork Ltd have hired our mid range SureStand 800 system on site which allows for Brickwork up to 3 metres high.

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

FORS SILVER – Approved for the 5th Year Running

+44 (0)208 795 3579

FORS SILVER – Approved for the 5th Year Running

24th November 2021

As far back as 2014 SafeStand® Ltd were looking at ways to improve our fleet operations throughout the UK. We decided to join the Fleet Operators Recognition Scheme (FORS) to help us deliver greater driver education, increase understanding throughout the business; implement fleet management tools and skills of how to surpass the current basic legal operational standards. SafeStand® Ltd met these requirements giving us the FORS Bronze accreditation.

In 2016 we chose to look at progressing to the higher FORS Silver standard, which we did. This helped us deliver further operational improvements including fleet visual aides to assist the driver and to help monitor our carbon footprint. This helped us to create a culture within the business placing a much greater emphasis on logistics from driver safety to vulnerable road users and the potential environmental factors when planning routes.

SafeStand has now met the FORS Silver Standard for a 5th consecutive year as we continue to look forward at new challenges and ways to improve.

FORS

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

SafeStand Going Green

+44 (0)208 795 3579

SafeStand Going Green

16th September 2021

As we all look more closely at our operations and how we can streamline while pursuing a reduction in our carbon footprint, SafeStand ® have done it again. Having upgraded all our vehicles to Euro 6 engines over the last few years we have turned our attention onto the warehouse operations.

We are proud to announce that we have purchased an electric JCB TLT 35-22E forklift and have retired our old faithful diesel forklift.  The JCB TLT 35-22E will reduce noise levels when operating within the confines of our warehouse as well as drive down our carbon emissions. We have been using this forklift for the past two weeks and have seen noise levels drop significantly, whist also generating zero exhaust emissions.

St Peters Church

St Peters Church

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

Newsletter 14 – SafeStand® Triple Guardrail

+44 (0)208 795 3579

Newsletter 14 – SafeStand® Triple Guardrail

Following a request from MACE (“Global experts in shaping the built environment – helping to lead the way to a more connected, resilient and sustainable world”) to investigate the possibility of adding a third guardrail at a height of 1500mm above the platform to SafeStand® Access Systems; we jumped at the opportunity to work with MACE to come up with a solution.

As a requirement of their SFSN (Safety First Second Nature) Standards for Mace Commercial Office and Residential, MACE are actively pushing ahead with a Minimum 1.5m high, triple handrail standard across all Work at Height Edge Protection.

Safestand have now completed a design, testing and on-site trials of an add on to our standard 5 Board wide systems that allows the installation of a third guardrail at 1500mm above platform whilst maintaining the SafeStand ethos of “Simplicity In Use”

We worked closely with a number of MACE personnel and with one of their supply chain partners, RI Works Ltd, to develop the Triple Guardrail solution.

“This all sounds really positive and I really like the positivity and drive towards developing this new innovation” – Matthew Lovett MCIOB, Construction Manager, MACE

SafeStand® Triple Guardrail in use at MACE Site – 33 Charterhouse Place, London EC1M

 

Patent application no. 2104896.2 and Design application no. 6128826 — United Kingdom

“Triple Guard Rail Extension”

in the name of Safestand Limited

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

Newsletter 13 – New & Improved SafeStand® 500

+44 (0)208 795 3579

Newsletter 13 – New & Improved SafeStand® 500

At SafeStand® we pride ourselves on being the leading provider of Low Level, Heavy Duty Access Systems.

With this in mind and in keeping with our ongoing remit of continual research and development, we are now ready to launch our “New & Improved SafeStand® 500 System”.

In line with our customers feedback and in order to continue providing the best system of its type in the marketplace, we have now reduced the weight of our SafeStand® 500 System by approx. 30% per stand whilst still maintaining the incredible Safe Working Load of 1000 kgs per stand.

Weight Comparison:

  SafeStand® Component Weights
Safestand® 500 New & Improved SafeStand® 500
SafeStand® Upper 10.0kg 7.8kg
SafeStand® Lower 14.8kg 10.2kg
SafeStand® Removable Front Post 3.1kg 1.6kg
  • The number of standard components is limited to eight, each of which are colour coded, to ensure clear and uncomplicated systems of work.
  • SafeStand Access System provides, Uninterrupted, more cost-effective production, without having to wait for other trades.

 

 

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk