Laing O’Rourke upgrade Nottingham’s Victoria Centre

+44 (0)208 795 3579

Laing O’Rourke upgrade Nottingham’s Victoria Centre

28/04/2015 – Principal contractor Laing O’Rourke have been awarded the works at the INTU Victoria Centre in Nottingham and have given the brick and blockworks to Castle Construction who are utilising the Safestand® Access System to carry our these works safely and efficiently.

The works include new mall finishes, improved lighting, new flooring and ceilings, upgraded toilet facilities and new entrances and a catering cluster around the clock tower area and will complete in later this year.

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

Safestand® aides Hunterston Power Station to bring renewable energy to the UK

+44 (0)208 795 3579

Safestand® aides Hunterston Power Station to bring renewable energy to the UK

16/03/2015 – John Sisk & Sons have selected SafeStand® Access Systems as there preferred method for low level access at Hunterston Power Station, Ayrshire.

This is the Scottish part of the National Grid and Scottish Power Western Link project, which will help bring the renewable energy from Scotland to the remainder of the UK by transmitting the power through the Convertor Station to a sub-sea cable before being connected to the grid again at Deeside Flintshire. A converter station is needed to convert the direct current (DC) electricity to alternating current (AC) so that it can be used within the existing electricity transmission system.

The transformers and other large electrical equipment for the converter station will be installed after being delivered by a specialist haulage company. They will be delivered by barge to the jetty by the wind turbine test facility, and then moved by a specialist transport company for the short distance between the jetty and converter station site.

The site is approximately 400m by 200m and is due for completion later this year.

 

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

Kier build new home for the Cardiff Devils

+44 (0)208 795 3579

Kier build new home for the Cardiff Devils

01/02/2015 – Kier Construction have started works on the new 3,000-seat ice arena at Cardiff Bay’s International Sports Village for the new home of the Cardiff Devils.  Safestand® are proud to be a part of this first phase of a much larger £250m scheme, which includes a 250m snow indoor ski slope, built above a 1,300-space multi-storey car park and shopping centre to add to the already growing Cardiff Pointe area which also home to the Olympic White Water Rafting.

Further phases will also include a 32-storey landmark tower, luxury hotel and flats.  Construction is expected to last 16 months meaning the new arena will not open until after the 2014/15 ice hockey season.

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

Balfour Beatty & IMBC On Exeter Residential Village

+44 (0)208 795 3579

Balfour Beatty & IMBC On Exeter Residential Village

Balfour Beatty Training Session 22.01.2015

22/01/2015 – Balfour Beatty and IMBC (Exeter) Ltd attended a SafeStand® Training Session on site at Millbrook Village, Exeter. The site is an age-exclusive residential village for Renaissance Villages Ltd and Helical Bar plc. Millbrook Village will comprise a selection of luxury cottages and apartments for the over-55s as well as a residents’ clubhouse featuring a private restaurant, bar and swimming pool. Work is underway on a selection of cottages and apartments as well as the clubhouse and staff accommodation. Balfour Beatty is committed to supporting the communities it works in and 90% of the 120 construction roles on the project will be secured from the local area. The project is designed to be highly sustainable. Martyn Osborne, Balfour Beatty Managing Director for Wales & West of England, said: “This is a prestigious scheme which will provide a high-class range of accommodation delivered over a four year period. This project builds on Balfour Beatty’s experience in the residential sector and we are committed to delivering this age-exclusive project to meet the needs of our customer and future residents.” IMBC (Exeter) Ltd are regular users of SafeStand® Access Systems and previously used it at Exeter University on a Mansell Construction site.

The first phase of the properties will be ready for occupation in summer 2014.

 

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk

Safestand® used at Blurton Extracare Scheme

+44 (0)208 795 3579

Safestand® used at Blurton Extracare Scheme

06/01/2015 – Eric Wright Construction and Keith Walton Brickwork are utilising Safestand® on the Blurton Extracare Scheme.  The new building will provide 75 self-contained one and two bedroomed apartments in three blocks linked together by covered bridges.

Created for people aged over 55, the villages will offer spacious apartments within a community setting, with facilities on site and conveniently located transport links .

Construction is a maximum of three storey high and mainly traditional brickwork with double pitched tiled roofs on a mixture of piled and traditional foundations and is expected to be completed in 2016.

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: office@safestand.co.uk